Key Performance Indicator Value Source
L: Location    
L2: Total distance to public transport stop, food service, nearest main residential area, divided by total items.

public transport stop: 5 m

food service: 100 m

residential area: 300 m

-
E: Energy and Emissions    
E1: Embodied energy from the total of off-site materials used in construction.  -

-

E2: Delivered energy in for all operating end uses.

76.5 kWh/m²/year end use energy

(110.7 kWh/m²/year primary energy)

FRENCH CALCULATION METHOD - RT2005
E3: The fraction of total annual operating energy (from E2) provided by on-site renewable energy production. 15% FRENCH CALCULATION METHOD - RT2005
E4: Greenhouse gas from delivered energy for all operating end uses.

16,7 Kg GHG/m² ua*yr

FRENCH CALCULATION METHOD - RT2005
M: Materials    
M1: Ratio of usable area to gross area above grade. 0,89 -
M2: Total weight per unit area of all materials in the project. - -
M3: Total weight of renewable materials in project. - -
M4: Total weight of re-used/recycled materials in project. 0 Tonnes /m² ua

-

M5: Fraction of building materials/elements with demounting/recycling instructions. - -
W: Water    
W1: Total gross water use per year used for occupants, irrigation and building systems. - -
W2: Net potable water per year supplied to the project. 0,5 m³ / m² ua*yr BMS
I: Indoor Environmental Quality    
I2: Indoor CO2 concentrations for typical occupancies under normal operating conditions. - -
I3: Indoor TVOC concentrations for typical occupancies under normal operating conditions. - -
I4: Daylight factor in typical room or space at lowest typical floor. 1,20% Daylight study
O: Others    
O1: Life cycle cost, or capital cost and actual or estimated operating cost. 6.500.000 Euros Construction cost