Key Performance Indicator Value Source
L: Location    
L2: Total distance to public transport stop, food service, nearest main residential area, divided by total items. 1382 metres routeplanner.nl google.nl 9292ov.nl
E: Energy and Emissions    
E1: Embodied energy from the total of off-site materials used in construction.  5,8kWh/m2  
E2: Delivered energy in for all operating end uses. 28,6kWh/m2/year  
E3: The fraction of total annual operating energy (from E2) provided by on-site renewable energy production. 100% EPU v. 202 (DGMR) Greencalc +
E4: Greenhouse gas from delivered energy for all operating end uses. 0  
M: Materials    
M1: Ratio of usable area to gross area above grade. 86% Project documents
M2: Total weight per unit area of all materials in the project. 590 kg/m2 Project documents
M3: Total weight of renewable materials in project. 319 kg/m2 Project documents
M4: Total weight of re-used/recycled materials in project. 174 kg/m2 Project documents
M5: Fraction of building materials/elements with demounting/recycling instructions. 96% Project documents
W: Water    
W1: Total gross water use per year used for occupants, irrigation and building systems. 230 m3 waterland.net
W2: Net potable water per year supplied to the project. 15 m3 waterland.net
I: Indoor Environmental Quality    
I1: Statement of conformance to applicable ventilation and air quality standard(s), e.g. ASHRAE, CIBSE, CEN etc.) 600 - 900 > 1200 max. CHri
I2: Indoor CO2 concentrations for typical occupancies under normal operating conditions. 600 CHri
I3: Indoor TVOC concentrations for typical occupancies under normal operating conditions. < 200 µg/m3 CHri
I4: Daylight factor in typical room or space at lowest typical floor. 33,9 Project documents
O: Others    
O1: Life cycle cost, or capital cost and actual or estimated operating cost. 2.600.000,- Euro