Key Performance Indicator Value Source
L: Location    
L2: Total distance to public transport stop, food service, nearest main residential area, divided by total items. 166 CEI
E: Energy and Emissions    
E1: Embodied energy from the total of off-site materials used in construction.  1586 kWh/m2 ua *yr CEI - assuming 170g CO2 per kWh
E2: Delivered energy in for all operating end uses. 64,69 kWh/m2 ua *yr AME - IES Energy model
E3: The fraction of total annual operating energy (from E2) provided by on-site renewable energy production. 68,4% AES & Skyfire Energy, PV designer/sub-contractor
E4: Greenhouse gas from delivered energy for all operating end uses. 3,2 kg GHG/m2 ua *yr CEI
M: Materials    
M1: Ratio of usable area to gross area above grade. 91% CEI
W: Water    
W1: Total gross water use per year used for occupants, irrigation and building systems.

0,2 m3 / m2 ua *yr

AME
W2: Net potable water per year supplied to the project. 0,1 m3 / m2 ua *yr AME
I: Indoor Environmental Quality    
I1: Statement of conformance to applicable ventilation and air quality standard(s), e.g. ASHRAE, CIBSE, CEN etc.) confirmed AME - ASHRAE 62.1 & California Title 24
I2: Indoor CO2 concentrations for typical occupancies under normal operating conditions. 900 ppm absolute AME - ASHRAE 62.1 & IES energy model
I3: Indoor TVOC concentrations for typical occupancies under normal operating conditions. 220 ppm average Chris Collett & Assoc - Independent air quality testing
I4: Daylight factor in typical room or space at lowest typical floor. 4,20% CEI
O: Others    
O1: Life cycle cost, or capital cost and actual or estimated operating cost. 27.650.000 $US OC/PCL - Capital cost (hard & soft costs), assuming $US=$Can approx.