Key Performance Indicator Value Source
L: Location    
L2: Total distance to public transport stop, food service, nearest main residential area, divided by total items. 300 metres -
E: Energy and Emissions    
E1: Embodied energy from the total of off-site materials used in construction.  33 kWh/m² ua*yr L. n. 10 - 1991.01.09
E2: Delivered energy in for all operating end uses. 10 kWh/m² ua*yr L. n. 10 - 1991.01.09
E3: The fraction of total annual operating energy (from E2) provided by on-site renewable energy production. 1,40% L. n. 10 - 1991.01.09
E4: Greenhouse gas from delivered energy for all operating end uses. 4,958 Kg GHG/m² ua*yr L. n. 10 - 1991.01.09
M: Materials    
M1: Ratio of usable area to gross area above grade. 85,56% -
M2: Total weight per unit area of all materials in the project. 0 -
M3: Total weight of renewable materials in project. 16 kg/m² ua -
M4: Total weight of re-used/recycled materials in project. 137 kg/m² ua -
M5: Fraction of building materials/elements with demounting/recycling instructions. 0 -
W: Water    
W1: Total gross water use per year used for occupants, irrigation and building systems. 0,39 m³ / m² ua*yr Protocollo ITACA
W2: Net potable water per year supplied to the project. 0,39 m³ / m² ua*yr Protocollo ITACA
I: Indoor Environmental Quality    
I1: Statement of conformance to applicable ventilation and air quality standard(s), e.g. ASHRAE, CIBSE, CEN etc.) 30 μg/mc ASHRAE
I4: Daylight factor in typical room or space at lowest typical floor. 4,87% UNI 10840
O: Others    
O1: Life cycle cost, or capital cost and actual or estimated operating cost. 7.390.000 € construction design